September 21, 2023 Commission Meetings (Cancelled)
September 21, 2023 @ 1:00 pm - 5:00 pm
Listing of Pending Administrative Matters
This report lists the administrative permit applications that are pending with the Commission. Due to the cancellation of the meeting of September 21, 2023, and pursuant to Commission Regulation Section 10620(a), the Executive Director will take final action on these matters unless a Commissioner requests full Commission consideration by communicating with the staff prior to September 29, 2023. In the absence of such a request, the listed matters will be executed administratively on or after September 29, 2023.
Administrative Permits Applications
Applicants
Pacific Gas and Electric Company
245 Market Street
San Francisco, CA 94105
BCDC Permit Application No. M2022.020.00
Filed on 09/14/23
90th Day on 12/13/23
Location
Within the Commission’s Bay and 100-foot shoreline band jurisdictions, at four locations in Marin and Sonoma Counties:
- At Tower 3/29, north of the Petaluma River (Sonoma County; 38.112097 °N, -122.491998 °W)
- At Tower 3/28, south of the Petaluma River (Marin County; 38.110117 °N, -122.494483 °W)
- At Tower 2/21, north of Novato Creek (Marin County; 38.092283 °N, -122.497717 °W)
- At Tower 2/20, south of Novato Creek (Marin County, 38.873806 °N, -122.498064 °W)
Description
The project would replace four existing electrical towers. Two towers will be removed from tidal marsh habitat in Bay Jurisdiction, two towers will be removed from 100-foot shoreline band jurisdiction. One new tower would be constructed in the Bay, and two towers would be constructed partially in the 100-foot Shoreline Band. To access the sites for tower removal and installation, 1.84 acres of construction matting will be temporarily placed in the 100-foot Shoreline Band, 3.13 acres of construction matting will be temporarily placed in tidal marsh habitat in the Bay, and two barge landings, supported by a total of 91 steel piles and covering 1,200 square feet will be temporarily constructed in the Bay. After construction of the new towers and removal of the existing towers and the temporary construction matting and barge landings is complete, the applicant shall restore all tidal marsh areas, and monitor them for success over at least five years. The project will result in a net removal of towers from BCDC jurisdiction to outside of BCDC jurisdiction, and from the Bay to 100-foot Shoreline Band.
Tentative Staff Position:
Recommend Approval with Conditions. (Rowan Yelton; 415/352-3613 or rowan.yelton@bcdc.ca.gov)
Applicants
Rich Island Duck Club
P.O. Box 5064
Walnut Creek, CA 94596
AND
Port of Stockton
2201 West Washington Street
Stockton CA 95203
BCDC Permit Application No. M2022.024.00md
Filed on 06/27/23
90th Day on 09/25/23
Location
In the Primary Management Area of the Suisun Marsh, at the Southern Portion of Simmons Island, unincorporated Solano County
Description
Restore approximately 30 acres of managed wetland, open water and upland areas on a managed wetland island in the Suisun Marsh. The project site is hydrologically connected to the other existing managed wetlands on Simmons Island, and the project would restore this site through regrading and vegetation management and planting. The project will result in a net gain in open water and wetland habitat, and a reduction in upland habitat. This project is the culmination of a long-standing enforcement violation of BCDC Consistency Determination No. C1985.006, which required the Port of Stockton to beneficially reuse dredged sediment that was placed on Simmons Island between 1986 and 1996. This project will resolve the enforcement case ER1990.026.00 by reusing the dredged sediment for habitat restoration.
Tentative Staff Position:
Recommend Approval with Conditions. (Rowan Yelton; 415/352-3613 or rowan.yelton@bcdc.ca.gov)
Applicants
Bandwidth IG, LLC
530 Lakeside Drive, Suite 190
Sunnyvale CA, 94085
BCDC Permit Application No. M2023.001.00
Filed: This application has not been filed, as the City of San Leandro discretionary approval for a lease of land required for the project will be voted on at a City Council meeting September 18, 2023. If the lease is not approved, this administrative listing will be rescinded.
90th Day – N/A
Location
Within the Commission’s Bay and 100-foot shoreline band jurisdictions, in the City of Brisbane at the southern corner of Lagoon Rd and Sierra Point Parkway, and the City of San Leandro, at the Bay Trail, west of the Tony Lema Golf Course and South of the Marina Dog Park, and along the Bay floor between those two sites.
Description
The project would install approximately 86,800 linear feet of two 2-inch-diameter fiber optic cables in the Bay, between underground landing vaults in the 100-foot Shoreline Bands in San Leandro and Brisbane. The project would result in approximately 5,000 cubic yards and 30,400 square feet of fill in the Bay. The project would not result in any public access impacts.
Tentative Staff Position:
Recommend Approval with Conditions. (Rowan Yelton; 415/352-3613 or rowan.yelton@bcdc.ca.gov)
Applicants
The Island Club, Inc
6227 Virgo Rd
Oakland CA 93611
BCDC Permit Application No. M2023.011.00md
Filed on 07/17/23
90th Day on 10/16/23
Location
Within the Commission’s Bay and 100-foot shoreline band jurisdictions, at Duck Club No. 501 in the Primary Management Area of the Suisun Marsh.
Description
Install two 24-inch-diameter HDPE water management drains with stainless steel flap gates through an exterior levee at the managed wetland. The project will result in approximately 100 square feet of solid fill. The purpose of the project is to improve the ability of the Club to manage their wetland.
Tentative Staff Position:
Recommend Approval with Conditions. (Rowan Yelton; 415/352-3613 or rowan.yelton@bcdc.ca.gov)